Blending bed
Level

Overview
To attain high quality and uniform material consistency in the finished cement, the raw material is homogenized in a so-called blending bed. The rock is distributed evenly over the blending bed with a stacker. Material is removed with a scraper. To ensure that the incoming material is distributed as evenly as possible, the level must be continuously measured.
Operating Conditions
- Measuring Task
- Level measurement
- Measuring Point
- Stockpile
- Medium
- Rocks
- Measuring Range
- 30 m
- Temperature
- -40 … +50 °C
- Pressure
- 0 … 0 bar
Challenges
- Dust, noise
Benefits
- Reliable: Reliable measurement even with strong dust generation
- Cost effective: Optimum storage capacity utilization
- User friendly: Maintenance and wear-free
Recommended Products
Wireless & Connectivity
Need Help With This Use Case?
Our team can help you select the right products.