TL;DR
يجب أن تصل الخرسانة الجاهزة لموقع العمل خلال 90 دقيقة من الخلط. يحسن تتبع GPS إرسال شاحنات الخلط ويراقب دوران الخلاطة لمنع الترسب.
The 90-Minute Clock
Concrete starts setting the moment water hits cement. At 40°C in a Saudi summer, that clock moves faster. Every wasted minute on the road costs material — a rejected batch means 8-10 cubic meters of concrete dumped and a delayed pour schedule.
What GPS Tracking Does for Concrete
Dispatch optimization: The platform shows which mixer is closest to the batch plant and which is closest to the job site. Dispatchers assign loads based on real-time location, not radio calls.
Drum rotation monitoring: A rotation sensor on the drum measures RPM. If the drum stops spinning during transit, the concrete settles and hardens. An alert fires immediately.
Weight compliance: Axle load sensors track the weight of each load. Overloaded mixers damage roads and risk fines at MOT weighbridges. The platform flags overweight departures before the truck leaves the plant.
Delivery confirmation: Geofence on the job site triggers an automatic timestamp when the mixer arrives. No more disputed delivery times.
Saudi Context
Saudi Arabia's NEOM, Riyadh Metro, and Red Sea Project are driving massive concrete demand. IPTech works with readymix operators supplying these projects. The combination of GPS tracking, weight sensors, and drum monitoring means fewer rejected batches, lower road fines, and tighter delivery schedules.
ابقَ على اطلاع
احصل على رؤى حول حلول التتبع وإنترنت الأشياء وتحديثات المنتجات في بريدك.

فريق تحرير IPTech
فريق التحرير
يغطي فريق تحرير IPTech تتبع GPS وإدارة الأسطول وإنترنت الأشياء الصناعي والنقل الذكي من مقرنا في الدمام، المملكة العربية السعودية.